When NOMEN was found in the PAOK environment, they realized the group had turned and started writing new chapters in its history. The approach shown by this change is demonstrated in the view of the premises of the auxiliary buildings on the stadium today. The refurbishment and partial reconstruction commissioned by the management concerned areas of vital importance for the stadium that were malfunctioning due to their age or noncompliance.
Specifically, the office entrance was transferred to a more convenient location, the offices were expanded, a meeting room was set up for the offices, the presidential suite ,the press room and the team changing rooms were renovated, physiotherapy and caregivers were rebuilt. The above are a design unit but obviously the design differs accordingly. The design line is given by the team, the habits of its members, its followers, its history and its colors.
Her interpretation by the architects creates a sense of space light, modern and athletic.Wood and iron are the basic building materials. They work in dynamic forms adapted to the geometry of the space. They come from the digital design and construction tools that make it easier for us today. Their surfaces, when not black and white, remain raw for wear and tear resistance. Maintenance of such a building is a matter of immeasurability
The design scale starts from the building, passes the room scale and ends up in the scale of the object where special needs are to be accommodated. An example would be the conference / presentations table or the staircase / footwear at the entrance to the changing rooms or the hot and cold bath tanks. Construction interventions had to be completed at the intervals of the races, which were always limited to twelve to fifteen days as large as they were. The tactic of the organized manufacturing attacks used helped us win the bet with time during a race period.