The summer house of a 350 sm footprint is scheduled to be constructed in 2020-2021 in a 13,5 s.km plot at the East part of Meganisi island, near Lefkada on a rocky landscape of low plantation. The whole volumetry is oriented to the sea view.
Splited in levels, the building is adjusted on the topography of the plot. The first level, the entrance level, houses the living areas. The wide openings give the tenant the feeling of freedom and coexistence with all the natural surroundings. The lounge space is extended to the terrace, through which we pass to the middle level of the pool and finally arrive in the lowest level, the bedrooms. This last level is adequately isolated to offer the tenants a good sleep and an amazing view when eyes open in the morning.
The off white cement forms interact with the rocky earth texture. Its violent interruption is not intented. Wooden pergolas follow the forms, in a light and shadow attractive play
The current project is designed for the development company 'myionianvillas'.